Main Board Repair History Archive

First production year:

The production strategy  evolved as production increased.  In the first production run, the loading vendor produced boards which were downloaded with code, run through an initial suite of room-temperature STF tests, then run through accelerated environmental testing, before a two day burn-in and integration testing in our lab.
There was fall-out at every stage. Serial numbers less than 1000

The repair histories can be found in this link:   Rev 5.0, 2004

Second Production year:

The second production run of 500 boards included provisions for downloading code, and initial STF testing at the loading vendor, with accelerated environmental testing, burn-in, and integration testing handled by our crew.    Again, there was fall-out at every stage. Serial numbers between 1000 and 2000
The third production run was much like the second, except that the vendor also took over accelerated environmental testing, burn-in.  Our crew did integrration testing. As usual, there was fall-out at every stage. Serial numbers between 2000 and 3000

The repair histories  can be found in this link:   Rev 5.1, 2005

Fall-out

A few boards from each production run  were  either DOA, or  suffered a severe failure, such that it is still unavailable for use either as a software development board, or production board.  The symptoms are varied. See list.